Also, if the water meter, instrumentation, and/or cabling is installed in the vicinity of electrically noisy equipment, such as motors, welders, or variable-frequency drives, the use of shielded cables is especially recommended! Also, if there is an extended distance between the water meter and the SCADA/Telemetry/BMS instrumentation (10+ feet), shielded cable is recommended for these Read More →